This platform is under active maintenance — some pages, resources, and pricing may be incomplete or temporarily unavailable.

TyflexTyflex.

Case Studies

See how our solutions have helped businesses across Zimbabwe achieve their goals.

0
days of downtime during migration

Harare Logistics Group · Logistics & Warehousing

Re-cabling a Three-Depot Warehouse Network Without a Day of Downtime

Challenge: Aging, undocumented cabling across three depots meant frequent outages and no visibility into where faults were occurring, slowing down picking and dispatch.

Solution: FlexTech re-cabled all three sites with structured Cat6 cabling and managed switches, then rolled out handheld barcode scanning across every depot.

Result: All three depots were migrated in phased overnight windows with zero disruption to daytime operations, and IT now has full visibility into network health across every site.

View the solution
50%+
reduction in monthly phone costs

Zimbank Retail Division · Financial Services

Cutting Branch Phone Costs in Half with a 3CX Rollout

Challenge: Each branch ran its own analog phone lines with no call routing between them, making it impossible to run a shared call center or track call volumes.

Solution: vFlex deployed a centralized 3CX system across every branch, with shared call queues, call recording, and a unified call center for customer support.

Result: Branch phone costs dropped significantly within the first year, and the new call center now handles support requests from every branch through one system.

View the solution
100%
of stores on one unified system

Cranborne Retail Group · Retail

Standardizing POS Across a Growing Retail Chain

Challenge: Different stores ran different till systems, making it impossible to see consolidated sales or stock data across the group.

Solution: FlexPOS installed matching POS terminals, receipt printers, and barcode scanners across every store, with inventory synced centrally in real time.

Result: Management now has live, consolidated sales and stock visibility across all locations, and new stores can be onboarded with a standard hardware kit in days.

View the solution
6 wks
from kickoff to go-live

Bluffhill Manufacturing · Manufacturing

Replacing Spreadsheets with a Single ERP System

Challenge: Finance, inventory, and payroll were managed in disconnected spreadsheets, leading to reconciliation delays and no real-time view of stock or costs.

Solution: Our team implemented an integrated ERP covering financial management, inventory control, and payroll, migrating historical data from existing spreadsheets.

Result: Month-end reconciliation time dropped substantially, and leadership now has a live dashboard across finance, inventory, and production costs.

Want results like these?

Tell us about your business and we'll put together a tailored plan — the same way we did for these clients.

Get a Free Quote